Local News

PHOTO: Rusticoville bridge replacement underway in P.E.I.

STORY CONTINUES BELOW THESE SALTWIRE VIDEOS

https://www.youtube.com/watch?v=videoseries

RUSTICOVILLE, P.E.I. — Work to switch the bridge in Rusticoville, which started on April 24, is ongoing.

Based on a information launch from April 21, two-lane site visitors will proceed alongside Route 6 in the course of the development of a brief bridge alongside the present bridge, which is getting changed.

The short-term bridge has a width restriction of three.2 metres in every lane, with a separate lane for pedestrians and cyclists.

Drivers are requested to make use of warning. Parking and water entry won’t be permitted alongside the south strategy.

The short-term bridge is anticipated to open to all site visitors on the finish of August 2023, and the brand new bridge is anticipated to open to all site visitors on the finish of June 2024.



Source link

Related Articles

Back to top button